Close 
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Bank of East Asia - Manchester

The Project

Specification

Pilkington Insulight™ comprising:

6 mm Pilkington Eclipse Advantage™ Arctic Blue T (outer pane)

16 mm Stainless Steel Spacer (Ψ 0.074) – Polysulphide Seal – Argon

6 mm Pilkington Optitherm™ S3 T (inner pane)

Structurally glazed with Metal Technology spacer toggle


Pilkington Insulight™ Comprising:

6 mm Pilkington Eclipse Advantage™ Arctic Blue T (outer pane)

16 mm Stainless Steel Spacer (Ψ 0.074) – Polysulphide Seal – Argon

8.8 mm Pilkington Optilam™ Therm S3 (inner pane)

Structurally glazed with Metal Technology spacer toggle


Pilkington Insulight™ Comprising:

6 mm Pilkington Eclipse Advantage™ Arctic Blue T (outer pane)

16 mm Stainless Steel Spacer (Ψ 0.074) – Polysulphide Seal – Argon

10.8 mm Pilkington Optiphon™ Therm S3 (inner pane)

Structurally glazed with Metal Technology spacer toggle


Pilkington Insulight™ Comprising;

6 mm Pilkington Eclipse Advantage™ Arctic Blue T (outer)

16 mm Stainless Steel Spacer (Ψ 0.074) – Polysulphide - Air

6 mm Pilkington Spandrel Glass - Standard colour ceramic coating complete with 60 mm Thermapitch TP10 foil backed foam insulation (inner) 

  Project ReferenceUK399_ProRef
  View Project Location Map
Project Details
Address
3-5 Charlotte Street, Manchester, M1 4HB
Building Type
  • Commercial
About the Architect/Installer
Architect
Fairhurst Architects
Installer
HW Architectural Ltd
Benefit Led Categories
  • Solar Control
  • Thermal Insulation