Close 
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Holland Hospital

The Project

The Holland Hospital underwent a six story operational hospital window replacement. Using Pilkington Arctic Blue™ the hospital replaced a 20,000 sq. ft. prefabricated curtainwall and aluminum windows. Also replacing, archtop framing, operable project-out awning vents, custom, special rated detention windows, security screens, and a fire-rated floor stop system.

Pilkington Arctic Blue™ was chosen to help make the hospital more energy efficient. Pilkington Arctic Blue™ provides the hospital with high daylight transmittance, good solar control, a cool and comfortable color, while still providing a soft, undistorted, natural view from the interior of the building.

  Project Referenceusa106
  View Project Location Map
Project Details
Surface Area
20,000 sq. ft.
Address
602 Michigan Avenue, Holland, MI 49423
Building Type
  • Public
About the Architect/Installer
Architect
Mattei & Colin associates
Installer
Vos Glass
Benefit Led Categories
  • Solar Control