The Project

The Early Childhood Development and Parenting Center has been designed to make optimum use of natural light and overall energy use is 25 percent less than in a typically constructed building. More than 20 percent of building materials in the 47,885 sq ft structure are made from recycled material.

Around 9,000 sq ft of Pilkington Eclipse Advantage™ Arctic Blue over Pilkington Energy Advantage™ was used for the insulating glass units at the Center, which is built around a central courtyard and features an all-glass façade.

The Harris Stowe project achieved LEED gold certification from the USGBC.

  Project Referenceusa68
  View Project Location Map
Project Details
Surface Area
9,000 sq ft
Address
Harris Stowe Childcare & Academic Facility 3026 Laclede Ave, St Louis, Missouri‎
Opening Date
2009
Building Type
  • Public
  • Education
Client
Harris Stowe University
About the Architect/Installer
Architect
KAI Design Build, St. Louis, MO
Installer
Fabricator: Oldcastle Warrenton; Sold by Bob Syroka, Syroka Assocs
Benefit Led Categories
  • Thermal Insulation