Close 
Thumbnail

Harris-Stowe State University

The Project

The Early Childhood Development and Parenting Center has been designed to make optimum use of natural light and overall energy use is 25 percent less than in a typically constructed building.  More than 20 percent of building materials in the 47,885 sq ft structure are made from recycled material.


Around 9,000 sq ft of Pilkington Eclipse Advantage™ Arctic Blue over Pilkington Energy Advantage™ was used for the insulating glass units at the Center, which is built around a central courtyard and features an all-glass façade.


The Harris Stowe project achieved LEED gold certification from the USGBC.

  Project Referenceusa68
  View Project Location Map
Project Details
Surface Area
9,000 sq ft
Address
Harris Stowe Childcare & Academic Facility 3026 Laclede Ave, St Louis, Missouri‎
Opening Date
2009
Building Type
  • Public
  • Education
About the Architect/Installer
Architect

KAI Design Build

St. Louis, MO

Installer

Fabricator -
Oldcastle Warrenton

Sold by Bob Syroka, Syroka Assocs