Close 
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Liverpool Cruise Terminal

The Project

Liverpool is the European Capital of Culture 2008, a city famous for the Beatles and football, and now it has another talking point thanks to the construction of a 350 metre-long pier and terminal at its historic docks. The terminal was officially opened by HRH the Duke of Kent as the QE2 made its 40th birthday visit to the city, and is an impressive welcome for some of the world's largest cruise liners.

The £17million development owes its striking appearance to the Pilkington Planar™ frameless structural glazing system. The new facility is built on four floating concrete pontoons and features a total of 949m2 of Pilkington Planar™ glazing for the cruise liner terminal's Reception building, including internal screens, the Pilot building and a 177m long covered walkway which links the two buildings together.

Liverpool Council specified the glazing because they wanted a high performance product in keeping with the illustrious nature of the project. The Pilkington Planar™ glazing and Pilkington Suncool™ combine to provide an aesthetically pleasing feature offering excellent solar control properties with high light transmittance. Passengers are now welcomed to Liverpool Pier in style, and it's a great way to show off the city for the increased number of visitors Liverpool is expecting in 2008.

Pilkington Planar™ glazing specification

Reception and Pilot building

195 m2 double glazed insulating glass units comprising of:

Toughened outer pane: 10mm Pilkington Suncool™ 50/25
Airspace: 16mm
Laminated inner pane: 13.52mm Pilkington Optilam™ Green

Internal screens

50m2 single glazed 17.52mm laminated glass comprising of:

Pane 1: 10mm Pilkington Optifloat™ Clear T (toughened)
Interlayer: 1.52mm
Pane 2: 6mm Pilkington Optifloat™ Clear HN (heat strengthened)


Covered walkway roof

243m2 single glazed 19.52mm laminated glass comprising of:

Pane 1: 12mm Pilkington Optifloat™ Clear T (toughened)
Interlayer: 1.52mm
Pane 2: 6mm Pilkington Optifloat™ Clear HN (heat strengthened)


Covered walkway walls

333m2 Single glazed toughened Glass:

10mm Pilkington Optifloat™ Clear T


The Pilkington Planar™ glazed screens and external façades are supported by a combination of toughened Pilkington Optifloat™ Clear structural glass fins and structural steelwork. Pilkington Planar™ 905-J stainless steel fittings are used throughout.

  Project ReferenceUK0053_ProRef
  View Project Location Map
Project Details
Address
Liverpool
Building Type
  • Office Building
About the Architect/Installer
Architect

Cass Associates
Studio 104
The Tea Factory
82 Wood Street
Liverpool
L1 4DQ
Tel: 0151 707 0110
Fax: 0151 707 0332
Email: all@cassassociates.co.uk

Installer

O.J. Taffinder Ltd
Batley
Tel: 01924 479184
Fax 01924 472391